The périods
called "works" are moments where activity is centered on a
specific project.
If you whan to learn a specific technic, you can choose the week you
come.
It's free. Food and accomodation are provided.
It's just asked to be listed, to come for the totality of the "work",
and to be here when the workshop starts, to have all the informations.
From
8 to 12 March 2010
Vegetable and tree seedings and Installation General Irrigation
From March
15 to 19, 2010
Installation dry toilets & Installation General Irrigation system in
the vegetable garden
From April
5 to 9 and 12 to 16 April 2010
Contruction of a little straw balls kitchen
* Foundation
* Straw balls walls
* Earth roof
Du 12 au
16 avril 2010
Kitchen space (follow and end)
* Coated earth
* Finishing touch
From May
31 to June 4 and June 7 to 11, 2010
Construction of a little cellar (preserving vegetables and fruits)
The project is to bury a winter house (tubes frame). The excavation
will have been done by a truck
* Installation tubes and corrugated iron
* Earth upon the corrugated iron
* Ventilation and drain
* Installation of the door
From June 14
to 18 and 21 to 25 June 2010
Renovation and earth/straw insulation of 40 m2 of roof at Maella (2nd
part) (1)
The 1st part has been done in 2009
* Discover and put off old tiles
* Change some beams if necessary
* Earth and straw insulation
* Cover (new tiles)
* Creation of a terrace
From September 13 to 17, 2010
Sanitary block
* Foundations (light)
* Construction with straw balls*
* Roof: frame, cover, ground
* Pond water supply
* Fountain with solar panels to prevent the stagnancy of the water
* For hot water : heat panel and tank
* For water pressure booster or highttank
* Water and electricity connections
* Basin-treatment plant for wastewater
From September
27 to October 1, 2010
Construction of a Ker-terre (ground igloo)
It's a lovely little hut of 3m diameter, build with earth and grass,
without frame.
Very cheap, ecological, and easy to build, it's ideal to create a meditation
space in the garden,
a place for the children, or a little place to live...
From 4 to 8 October 2010
Sanitary block and pond (follow and end)
Finishing touch for the sanitary block and pond
* Connections
* Walls coating (earth)
* Decoration
From 18 to
22 October 2010
Almonds harvest
December
2010 and January 2011
Olives harvest and pressing (for oil)
|